Category: PCI Girder Bridge

Supply of LIMOV IGL-55T Lifting Frame for PCI Girder (Patented) to Sarana for construction of Probolinggo-Banyuwangi Toll Road

LIMOV Girder Lifter IGL-55T (patented) is used in the construction of Probolinggo-Banyuwangi Toll Road (Probowangi) in East Java. Probowangi Toll Road is the last section of Trans-Java Toll Road that connects the whole Java island. Main contractor is PT Hutama Karya Infrastruktur (HKI) and the crane contractor is PT Sarana Rintasindah. LIMOV Lifting Frame for …

Supply of LIMOV PCI-Girder Lifter IGL-50T (Patented) to PTPP for construction of Kopo Flyover Project

Picture courtesy of PT PP (Persero) Tbk. Kopo intersection in Bandung, West Java has very crowded traffic jam. To solve this problem, PT PP (Persero) Tbk was hired as main contractor to build a flyover. The construction process was very challenging since the area is heavily congested. The most critical part of the construction process …

Supply of LIMOV IGL-50T Lifting Frame for PCI Girder (Patented) to PTPP for construction of Semarang-Demak Toll Road

Semarang-Demak Toll Road is highly critical route along the northen coast of Java Island. A large part of Indonesian logistics go through this route. The existing aging infrastructure cannot meet the increasing volume of vehicle and cargo. The problem is worsened by the rise of sea level and regular flood. To solve this issue, Indonesian …

Engineering supervision for the construction of PCI-Girder Bridge in Jakarta-Cikampek Selatan Toll Road

LIMOV completed the construction of PCI Girder Bridge in Jakarta-Cikampek Selatan Toll Road in Purwakarta area. Once finished, it will reduce the traffic burden on the existing Jakarta-Cikampek. Main contractor is PT Waskita Karya (Persero) Tbk.

Supply of LIMOV Spreader Beam SBE-30T WLL 30000 kg for lifting pierhead segment in Becakayu Toll Road Project

LIMOV delivers Spreader Beam SBE-30T with lifting capacity of 30000 kg to PT Waskita Karya (Persero) Tbk. It is used to lift pierhead segment in Becakayu Toll Road project in DI Panjaitan section.

Supply of LIMOV Girder Lifter GL-75T (Patented) for lifting of long-span PCI-Girder in Kapalbetung 1B Toll Road

LIMOV delivers Girder Lifter GL-75T (Patented) to PT Waskita Karya (Persero) Tbk. It is used for lifting long-span PCI-Girder at 50.8 m length in Kapalbetung 1B Toll Road in South Sumatra. The 50.8 m girder is very slender and unstable if lifted in the wrong way. It could lead to catastrophic failure when it buckles …

Construction Engineering Service for PCI-girder erection using Launching Gantry in Krian-Legundi-Bunder 2 (KLB2) Toll Road

LIMOV is awarded contract for Construction Engineering Service (CES) by PT Waskita Karya (Persero) Tbk. Our scope of works is to review and perform thorough structural assessment of Launching Gantry and Gantry Crane used for the erection of PCI-Girder in Krian-Legundi-Bunder 2 (KLB2) Toll Road. KLB2 Toll Road connects Sidoarjo and Gresik, both are highly …

Engineering service for Launching Gantry and special-span PCI Girder in Krian-Legundi-Bunder Toll Road

LIMOV is awarded contract by PT Waskita Karya (Persero) Tbk. to provides Engineering Service for Launching Gantry in Krian-Legundi-Bunder (KLB) Toll Road. The Launching Gantry will lift special-span PCI Girder at 50.8 m length which is considered critical lifting.

Supply of LIMOV GL-75T Lifting Frame for PCI Girder (Patented) for construction of Semarang Toll Road near Krapyak

LIMOV supplied GL-75T Lifting Frame for PCI Girder for erection of special span PCI Girder 50 m in Semarang Toll Road near Krapyak. The main contractor is PT Waskita Karya (Persero) Tbk. The Krapyak section is the last section in the whole Trans Java Toll Road network at the time. LIMOV is glad to take …

Construction Engineering Service for PCI-Girder erection using Launching Gantry for Becakayu Toll Road

LIMOV is awarded contract by PT Waskita Karya (Persero) Tbk. to provide Construction Engineering Service (CES) in Becakayu Toll Road Project in along Kalimalang road. Our scope of works is engineering analysis and supervision for the PCI-Girder erection using Launching Gantry. We also prepare all the lifting plan from post-tensioning yard until the girders sit …