Installation and commissioning of LIEBHERR Fixed-Cargo Crane FCC 280 in Mangole Jetty for Sampoerna Kayoe

LIMOV just completed the installation of two sets of Liebherr FCC 280 for PT Mangole Timber Producers (MTP), a subsidiary of Sampoerna Kayoe. MTP is one of the largest fully integrated plywood factory in Indonesia. LIMOV is MTP subcontractor for crane installation and also log handling system for the plywood factory. The cranes installation process …

Manufacturing of Split Flange for TITIAN for BP Tangguh Turnaround Project

LIMOV just delivered Split Flange to PT Titian Servis Indonesia. It will be used in BP Tangguh Piping Turnaround 2024. The Split Flange is one of the most critical part and the final touch in the piping system.

Construction Engineering Service for LIANDO Box-Segmental Launching Gantry LG-S40 in Jalan Layang Kereta Api Medan-Binjai

Picture courtesy of PT Hutama Karya and PT Wijaya Karya Beton (Persero) Tbk. LIMOV completes the Construction Engineering Service for our client, PT Wijaya Karya Beton (Persero) Tbk. Our scope of works are structural analysis and modification of LIANDO Box-Segmental Launching Gantry LG-S40 to higher lifting capacity for the project Jalan Layang Kereta Api Medan-Binjai …

Engineering and procurement of LIMOV Ore-Pass Airbag for Freeport Indonesia Underground Mining

LIMOV designed and supplied Ore Pass Airbag (OPA) protection system to PT Freeport Indonesia. It will be used to secure Ore Pass in the underground mining operation in Timika.

Supply of LIMOV PCI-Girder Lifter IGL-55T (Patented) to Sarana for construction of Probolinggo-Banyuwangi Toll Road

LIMOV Girder Lifter IGL-55T (patented) is used in the construction of Probolinggo-Banyuwangi Toll Road (Probowangi) in East Java. Probowangi Toll Road is the last section of Trans-Java Toll Road that connects the whole Java island. Main contractor is PT Hutama Karya Infrastruktur (HKI) and the crane contractor is PT Sarana Rintasindah. LIMOV Girder Lifter products …

LIMOV is awarded contract by Girder Indonesia for engineering service for Harbour Road 2 Toll Road Project

PT Limov Power Structure is awarded Construction Engineering Service contract for Harbour Road 2 (HR2) Toll Road by PT Girder Indonesia. HR2 is the second layer toll road built on top of the existing Harbour Road. Both the old Harbour Road and the new HR2 Toll Roads are owned by PT Citra Marga Nusaphala Persada …

Design and construction of Service Crane for Pertamina Algeria Compressor Turnaround Project

On June 2023, Pertamina Algeria together with Sonatrach shutdown the Menzel Ledjmet Nord oil field in Algeria in order to replace the Bundle Compressor. The compressor building was not designed for this kind of job because it does not have service crane or any other handling system for the bundle replacement job. The compressor is …

Construction and installation of Anchor Cage for the foundation of LIEBHERR Fixed Cargo Crane FCC 280 in Mangole Timber Producer jetty

LIMOV delivers two sets of Anchor Cages to Mangole Timber Producer (MTP) jetty in North Maluku island. The Anchor Cages are designed for LIEBHERR Fixed Cargo Crane FCC 280 which will be used by MTP to load and unload cargo to and from mother vessel.

Engineering design and structural analysis of Juno Sugar Hopper Platform for Mazhak

LIMOV completed Engineering Design and Structural Analysis of Sugar Hopper Platform. Our customer is PT Mazhak Teknik Indonesia, one of the leading stainless equipment manufacturer in Indonesia. The challenge in the design is because the civil work for the factory building is already finished and there is no opening on top for installation of the …

Erection of Becakayu Toll Road Ahmad Yani Steel-Box Arch Bridge for Waskita Karya

We just completed the erection of Becakayu Toll Road bridge in Ahmad Yani, West Bekasi. Main contractor is PT Waskita Karya (Persero) Tbk and crane vendor is PT Superkrane Mitra Utama Tbk. This is the largest superlift ever done in the heart of a metropolitan city like Bekasi. This project used two superlift cranes: Liebherr …