Tag: Waskita Karya

Erection of Becakayu Toll Road Ahmad Yani Steel-Box Arch Bridge for Waskita Karya

We just completed the erection of Becakayu Toll Road bridge in Ahmad Yani, West Bekasi. Main contractor is PT Waskita Karya (Persero) Tbk and crane vendor is PT Superkrane Mitra Utama Tbk. This is the largest superlift ever done in the heart of a metropolitan city like Bekasi. This project used two superlift cranes: Liebherr …

Engineering design and supervision for Form Traveller for the construction of Ogan River Balanced-Cantilever Bridge

LIMOV provides Engineering Design and Supervision for Form Traveller in Ogan Bridge Project. The Ogan Bridge is part of Trans Sumatra Toll Network. The main contractor is PT Waskita Karya (Persero) Tbk. It is balanced cantilever type with cast-in-situ construction method. The Form Traveller plays critical part as it will carry the form and lock …

Engineering supervision for the construction of PCI-Girder Bridge in Jakarta-Cikampek Selatan Toll Road

LIMOV completed the construction of PCI Girder Bridge in Jakarta-Cikampek Selatan Toll Road in Purwakarta area. Once finished, it will reduce the traffic burden on the existing Jakarta-Cikampek. Main contractor is PT Waskita Karya (Persero) Tbk.

Design and supply of LIMOV Underhung Work Platform UWP-500 for Becakayu Toll Road Project

LIMOV delivers Underhung Work Platform UWP-500 to PT Waskita Karya (Persero) Tbk for the Becakayu Toll Road project. The Work Platform will be used to do finishing on the outer and bottom side of Becakayu elevated bridge in the Cawang and Kalimalang area. Becakayu is acronym of Bekasi-Cawang-Kampung Melayu, three crowded area in Jakarta where …

Supply of LIMOV Spreader Beam SBE-30T WLL 30000 kg for lifting pierhead segment in Becakayu Toll Road Project

LIMOV delivers Spreader Beam SBE-30T with lifting capacity of 30000 kg to PT Waskita Karya (Persero) Tbk. It is used to lift pierhead segment in Becakayu Toll Road project in DI Panjaitan section.

LIMOV is awarded contract by Waskita for Construction Engineering Service for Ogan River Balanced-Cantilever Bridge

We were just awarded contract for Construction Engineering Service for Ogan River Balanced Cantilever Bridge. The bridge will be constructed using cast-in-situ method using Form Traveller. LIMOV will be in charge of the engineering and supervision of the Form Traveller. Ogan River Bridge is one of the largest bridge in Kayu Agung-Palembang-Betung (Kapalbetung) Toll Road. …

Supply of LIMOV Girder Lifter GL-75T (Patented) for lifting of long-span PCI-Girder in Kapalbetung 1B Toll Road

LIMOV delivers Girder Lifter GL-75T (Patented) to PT Waskita Karya (Persero) Tbk. It is used for lifting long-span PCI-Girder at 50.8 m length in Kapalbetung 1B Toll Road in South Sumatra. The 50.8 m girder is very slender and unstable if lifted in the wrong way. It could lead to catastrophic failure when it buckles …

Construction Engineering Service for PCI-girder erection using Launching Gantry in Krian-Legundi-Bunder 2 (KLB2) Toll Road

LIMOV is awarded contract for Construction Engineering Service (CES) by PT Waskita Karya (Persero) Tbk. Our scope of works is to review and perform thorough structural assessment of Launching Gantry and Gantry Crane used for the erection of PCI-Girder in Krian-Legundi-Bunder 2 (KLB2) Toll Road. KLB2 Toll Road connects Sidoarjo and Gresik, both are highly …

Engineering service for Launching Gantry and special-span PCI Girder in Krian-Legundi-Bunder Toll Road

LIMOV is awarded contract by PT Waskita Karya (Persero) Tbk. to provides Engineering Service for Launching Gantry in Krian-Legundi-Bunder (KLB) Toll Road. The Launching Gantry will lift special-span PCI Girder at 50.8 m length which is considered critical lifting.

Supply of LIMOV GL-75T Lifting Frame for PCI Girder (Patented) for construction of Semarang Toll Road near Krapyak

LIMOV supplied GL-75T Lifting Frame for PCI Girder for erection of special span PCI Girder 50 m in Semarang Toll Road near Krapyak. The main contractor is PT Waskita Karya (Persero) Tbk. The Krapyak section is the last section in the whole Trans Java Toll Road network at the time. LIMOV is glad to take …