Tag: Ogan Bridge

Engineering design and supervision for Form Traveller for the construction of Ogan River Balanced-Cantilever Bridge

LIMOV provides Engineering Design and Supervision for Form Traveller in Ogan Bridge Project. The Ogan Bridge is part of Trans Sumatra Toll Network. The main contractor is PT Waskita Karya (Persero) Tbk. It is balanced cantilever type with cast-in-situ construction method. The Form Traveller plays critical part as it will carry the form and lock …

LIMOV is awarded contract by Waskita for Construction Engineering Service for Ogan River Balanced-Cantilever Bridge

We were just awarded contract for Construction Engineering Service for Ogan River Balanced Cantilever Bridge. The bridge will be constructed using cast-in-situ method using Form Traveller. LIMOV will be in charge of the engineering and supervision of the Form Traveller. Ogan River Bridge is one of the largest bridge in Kayu Agung-Palembang-Betung (Kapalbetung) Toll Road. …

Engineering and construction of Floating Batching Plant for Ogan Bridge Project in Palembang

In December 2017, LIMOV completed the Engineering and Construction of Floating Batching Plant for PT Waskita Karya (Persero) Tbk. The batching plant was built on the deck of 300 feet barge. It will supply ready mix concrete for the construction of Ogan Bridge. The bridge is balanced cantilever cast in situ type. It is part …