LIMOV is awarded contract by PT Waskita Karya (Persero) Tbk. to provide Construction Engineering Service (CES) in Becakayu Toll Road Project in along Kalimalang road. Our scope of works is engineering analysis and supervision for the PCI-Girder erection using Launching Gantry. We also prepare all the lifting plan from post-tensioning yard until the girders sit …
We just deliver LIMOV GL-75T, PCI-Girder Lifter WLL 85000 kg, to PT Waskita Karya (Persero) Tbk. The Lifting Frame wil be used for erection of special long-span bridge in Batang-Semarang Toll Road. This is part of Trans Java Toll Road. Any PCI Girder above 40 m long is categorized as special long span and must …
Lifting the 50 meter-long Prestressed Concrete I-Girder (PCI Girder) is a very critical and dangerous job. There have been some accidents where the very slender PCI Girder buckled and collapsed, both during and shortly after lifting, due to wrong lifting technique. LIMOV is the first company in Indonesia to addressed this problem by creating special …
LIMOV design and supply Parapet Form Traveller PFT-5M to PT Waskita Karya (Persero) Tbk. This Form Traveller will be used in casting of Becakayu Toll parapet along the Cawang area. It is very important to use proper and well designed Form Traveller since there is a very crowded traffic under the Becakayu Toll Road so …
LIMOV is awarded contract for Construction Engineering Service (CES) in Becakayu elevated toll road along Kalimalang River. The CES covers design review of the Launching Gantry (LG), LG structural analysis, inspection and supervision during erection. Our client is PT Waskita Karya (Persero) Tbk. The Becakayu Toll Road is owned by PT Kresna Kusuma Dyandra Marga …
In December 2017, LIMOV completed the Engineering and Construction of Floating Batching Plant for PT Waskita Karya (Persero) Tbk. The batching plant was built on the deck of 300 feet barge. It will supply ready mix concrete for the construction of Ogan Bridge. The bridge is balanced cantilever cast in situ type. It is part …
On 2 October 2017, LIMOV completed the erection of LRT Musi Bridge in Palembang. It is the most difficult part in the LRT Palembang project because the bridge erection was all done over the busy Musi River. The LRT Musi Bridge location is alongside the historical Ampera Bridge, one of the most iconic bridge in …
On 2 October 2017, LIMOV completed the erection of LRT Musi Bridge in Palembang. It is the most difficult part in the LRT Palembang project because the bridge erection was all done over the busy Musi River. The LRT Musi Bridge location is alongside the historical Ampera Bridge, one of the most iconic bridge in …
LIMOV designed and managed one of the most sophisticated lifting process in LRT Musi Bridge. One of the span is near Pasar 16 Ilir Palembang, one of the oldest and most crowded traditional market in South Sumatra. Due to social and historical issue, the market area cannot be cleared for crawler cranes. We prepared a …
LIMOV is commissioned by PT Waskita Karya (Persero) Tbk. to provide Construction Engineering Service (CES) for Form Traveller in Becakayu Cawang Flyover. The flyover is balanced-cantilever type and cross above the existing Cawang-Tanjung Priok Toll Road (Wiyoto Wiyono). It is one of the most critical and complex bridge construction due to the challenges. LIMOV scope …