Together with Pertamina Algeria and Sonatrach team, LIMOV completed the Radiant Coil replacement for H-101 Fired Heater in Menzel Ledjmet Nord (MLN) Oil Field, Algeria. It is the most critical job during the scheduled MLN 2020 Turnaround. The method of building modular tower crane inside the Fired Heater to extract all the old pipe bundles …