Category: Bridge

Design and supply of LIMOV Box-Segmental Girder Lifter BGL-58T for construction of Enam Ruas Tol Dalam Kota Project

LIMOV just delivered our Box-segmental Girder Lifter SWL 58000 kg, BGL-58T, to PT Tensindo Kreasi Nusantara. The Lifter is used for erection of Box Segmental Bridge in the Enam Ruas Tol Dalam Kota project. Tensindo is the subcontrator for erection and post tensioning. The main contractors are PT Adhi Karya (Persero) Tbk and PT Jaya …

Structural analysis of TOLIAN Box-Segmental Launching Gantry LG850T for the Bogor Outer Ring Road Project

LIMOV completed egineering review and structural analysis of TOLIAN LG850T for the Bogor Outer Ring Road (BORR) Project. Our client is PT Girder Indonesia (GI). The TOLIAN LG850T is Launching Gantry designed and built for box-segmental type bridge. BORR main contractor is PT PP (Persero) Tbk. Once completed, BORR will be the very important infrastructure …

Construction engineering service for TOLIAN Box-Segmental Launching Gantry LG830T for Pettarani Elevated Toll Road

Picture courtey of PT Wijaya Karya Beton (Persero) Tbk. LIMOV provides Construction Engineering Service (CES) in Pettarani Elevated Toll Road project in Makassar. Our scope of work is to do structural analysis and assessment for the TOLIAN Box-Segmental Launching Gantry LG830T which will be used for the erection of the bridge. Our client is PT …

Design and supply of LIMOV Underhung Work Platform UWP-500 for Becakayu Toll Road Project

LIMOV delivers Underhung Work Platform UWP-500 to PT Waskita Karya (Persero) Tbk for the Becakayu Toll Road project. The Work Platform will be used to do finishing on the outer and bottom side of Becakayu elevated bridge in the Cawang and Kalimalang area. Becakayu is acronym of Bekasi-Cawang-Kampung Melayu, three crowded area in Jakarta where …

Supply of LIMOV Spreader Beam SBE-30T WLL 30000 kg for lifting pierhead segment in Becakayu Toll Road Project

LIMOV delivers Spreader Beam SBE-30T with lifting capacity of 30000 kg to PT Waskita Karya (Persero) Tbk. It is used to lift pierhead segment in Becakayu Toll Road project in DI Panjaitan section.

LIMOV is awarded contract by Waskita for Construction Engineering Service for Ogan River Balanced-Cantilever Bridge

We were just awarded contract for Construction Engineering Service for Ogan River Balanced Cantilever Bridge. The bridge will be constructed using cast-in-situ method using Form Traveller. LIMOV will be in charge of the engineering and supervision of the Form Traveller. Ogan River Bridge is one of the largest bridge in Kayu Agung-Palembang-Betung (Kapalbetung) Toll Road. …

Supply of LIMOV Girder Lifter GL-75T (Patented) for lifting of long-span PCI-Girder in Kapalbetung 1B Toll Road

LIMOV delivers Girder Lifter GL-75T (Patented) to PT Waskita Karya (Persero) Tbk. It is used for lifting long-span PCI-Girder at 50.8 m length in Kapalbetung 1B Toll Road in South Sumatra. The 50.8 m girder is very slender and unstable if lifted in the wrong way. It could lead to catastrophic failure when it buckles …

Construction Engineering Service for PCI-girder erection using Launching Gantry in Krian-Legundi-Bunder 2 (KLB2) Toll Road

LIMOV is awarded contract for Construction Engineering Service (CES) by PT Waskita Karya (Persero) Tbk. Our scope of works is to review and perform thorough structural assessment of Launching Gantry and Gantry Crane used for the erection of PCI-Girder in Krian-Legundi-Bunder 2 (KLB2) Toll Road. KLB2 Toll Road connects Sidoarjo and Gresik, both are highly …

Engineering service for Launching Gantry and special-span PCI Girder in Krian-Legundi-Bunder Toll Road

LIMOV is awarded contract by PT Waskita Karya (Persero) Tbk. to provides Engineering Service for Launching Gantry in Krian-Legundi-Bunder (KLB) Toll Road. The Launching Gantry will lift special-span PCI Girder at 50.8 m length which is considered critical lifting.

Supply of LIMOV GL-75T Lifting Frame for PCI Girder (Patented) for construction of Semarang Toll Road near Krapyak

LIMOV supplied GL-75T Lifting Frame for PCI Girder for erection of special span PCI Girder 50 m in Semarang Toll Road near Krapyak. The main contractor is PT Waskita Karya (Persero) Tbk. The Krapyak section is the last section in the whole Trans Java Toll Road network at the time. LIMOV is glad to take …